Choconut Creek Restoration Design and Permitting

 

Executive Summary

 

Choconut Creek, a Susquehanna River tributary, spans the Pennsylvania-New York Border.  The Pennsylvania portion of the watershed drains 30.5 square-miles of Susquehanna County.  The stream channel is entrenched in many locations with highly unstable banks that produce large volumes of fine sediment.  Left unchecked, bank erosion and sediment production will continue to impact this stream system for the foreseeable future.  Of particular concern is the particle size of sediment being produced from the stream banks.   The majority of Choconut Creek banks are composed of fine soil materials.  Not only is valuable farmland being eroded at an alarming rate, nutrients that attach to the fine soil particles can be transported into the Susquehanna River and ultimately the Chesapeake Bay.  This proposed project will reduce bank erosion and sediment production for a 1.5 mile reach of Choconut Creek.  This reach of stream and all downstream reaches will benefit from this work.  A current stream restoration project immediately downstream from the proposed 1.5-mile restoration reach will be protected and enhanced by completion of upstream restoration.

The following tasks will be achieved by completion of this project. 

 

Construction Ready Design –1.5 Miles of stream channel restoration will be designed using natural channel design techniques.  Detailed topographic/hydrograph survey will be completed on each of the four design reaches.  The survey results will be presented in detailed 3-dimensional drawings for geomorphic analysis, design, and construction.  The design will be completed using natural stream design and accepted fluvial geomorphic principles.  Erosion and Sedimentation Plans and riparian vegetation planting plans will be produced as part of the design work. 

 

Permitting - All permit applications and the required supporting documentation will be prepared and submitted to the required agencies for approval.

 

Operation and MaintenancePartnerships for an Operation and Maintenance Agreement will be formalized.  Landowner agreements for proper maintenance and protection of the restoration work will be drafted and implemented. 

 

Statement of Need and Justification of Funding

 

Choconut Creek is producing large sediment loads due to severe channel instability.  The stream channel is entrenched in many locations and highly unstable reaches cause significant property damage.  Channel instability is threatening homes, roads, and utilities while introducing thousands of cubic yards of sediment per year to the stream channel.  Sediment produced from this 30.5 square-mile drainage area reduces channel stability downstream.  This sediment enters the Susquehanna River and ultimately the Chesapeake Bay.  In addition to the sediment, particles bound to the sediment such as phosphorus may be mobilized and transported to the bay. 

 

A strategic restoration plan for Choconut Creek is currently in draft form.  From the assessment data collected as part of the strategic plan, areas of unstable stream channel and bank failure were identified (see attached maps).  Large gravel bars are migrating through the stream system.   This is evident from the bed forms in the stream channel and the prevalence of mid-channel bar deposits along the stream.  If allowed to continue to migrate downstream the sediment load will further destabilize downstream reaches of Choconut Creek and increase flood damage as the channel bed elevation increases. 

 

As part of the recently initiated watershed assessment, stream bank and channel stability were evaluated from St. Josephs downstream to the NY State line.

 

Over 9,000 feet of unstable stream bank were located through this survey.  These eroding banks introduce an estimated 50,000 tons per year of sediment to the system.  Much of this sediment is fine-grained soil particles that can severely impact aquatic life in Choconut Creek and further downstream in the Susquehanna River.  Poor vegetation cover on the unstable banks allows bank erosion to continue unchecked in many locations. 

 

Gravel bars were located in 29 stream reaches indicating excess sediment loads in the stream system.  Gravel bar deposits split the stream channel and cause additional stream channel instability and bank erosion.  The bar deposits are indicators of excess sediment that exceeds the stream’s sediment transport capacity.  These conditions upstream from the stream reaches currently targeted for restoration have the potential to reduce the effectiveness of the current restoration project located immediately downstream of the proposed project area. 

 

Bank Erosion Summary

Severity

Count

Total Length (Meters)

Extreme

6

311

Severe

22

688

Moderate

55

1369

Mild

32

1370

 

In total over 3,700 meters (2.3 miles) of  bank erosion and channel instability threatens property and aquatic life along Choconut Creek. 

In addition to improving aquatic habitat, reducing non-point source sediment inputs, and protecting property this project will continue and enhance community involvement in the watershed.  The Montrose Area School District is a property owner adjacent to reach of stream channel targeted for restoration.  Numerous educational programs within the district focus on Choconut Creek.  These programs will grow and improve as a result of this restoration project. 

 

Strong community support and strategic partnerships provide the Choconut Creek Watershed Association the solid support necessary for success of a project on this scale.  Signed landowner agreements for this reach of  stream are attached to this application. 

 

Goals and Objectives

 

The primary goal of this project is to complete a detailed construction-ready design based on solid strategic planning that will provide a large reduction in sediment output from the Choconut Creek Watershed and protect downstream restoration efforts.  Areas where infrastructure and property are threatened by rapid stream channel migration will be reduced.  Both aquatic and riparian ecosystems will benefit from the completion of this project. 

 

 

  1. Complete design of 1.5 miles of natural channel restoration, collect detailed survey data within the reaches and interconnecting reaches to provide a framework for the design. 

The goals of the watershed association advocate learning about the systematic causes of channel instability and habitat impairment to provide solutions at the watershed scale.  Completion of this design will allow the watershed association to implement restoration efforts that avoid “band-aid” fixes and focus on a systems based approach to stream restoration with each restoration project being a key piece of the entire watershed system. 

 

  1. Complete addendum to watershed wide permit and all supporting documentation for the restoration reaches.

The watershed wide permit submitted in 2002 provides the baseline information for the watershed utilizing the restoration plan.  These projects as components of the strategic plan can be submitted as addendums to the permit streamlining the processes.   

 

3.     Develop an innovative Operation and Maintenance Agreement for protection of the restoration project.

It is important the integrity of restoration work completed by the watershed association be protected over time.  To this end, the watershed association and other partners will work with local municipalities to develop ordinances protecting stream restoration work.  Additionally an Operation and Maintenance Program will be developed for implementation with construction of the designed restoration reaches.  Local and regional partners will be solicited for commitments to the Operation and Maintenance Agreement.  An agreement for landowner consent and maintenance guidelines will be drafted for use with restoration construction. 

 

Partnerships

            The Choconut Creek Watershed Association is partnered with the following organizations to complete this project: Susquehanna County Conservation District, Choconut Township, Silver Lake Township, Edward L. Rose Conservancy, Montrose Area School District, watershed landowners, and Larson Design Group, Inc.(LDG).  

 

 

Work Plan

 

Fall 2002 – Winter 2003

To provide the data required to complete the natural channel design, aerial topography and ground-based detailed channel hydrography will be completed for the restoration reaches.  Necessary survey data to link the intervening reaches to the overall design will be collected. 

Working drawings will be produced using Computer Aided Drawing software.  Details including longitudinal profiles, channel cross-sections at intervals through the design reaches, and overall plan views will be generated. 

 

Detailed geomorphic design data including multiple particle size distributions, hydrology/hydraulics data, and bar sediment sieving will be completed.  Locations of grade control and bridge crossing dimensions will be incorporated into the dataset.  Design constraints will be identified. 

 

Winter 2003

Preliminary design will begin in Winter 2003.  Using reference reach data, if available, regional curve data, and regime equations the proper channel alignment will be determined.  This alignment will then be evaluated using aerial photography and the existing survey data to determine if there are problem areas.

 

Once the preliminary alignment is established, meetings will be held with landowners to review the channel alignment and determine if there are any landowner issues. 

 

Upon reaching a satisfactory alignment in conjunction with the landowners, the design can proceed. 

 

 

Spring 2003 – Winter 2004

Detailed design work will be completed for each of the restoration reaches.  Natural channel design techniques will be applied to the final construction-ready design for the four restoration reaches.  Proper channel dimensions in plan form and cross-sectional form will be detailed on engineering plan sheets.  Where necessary, rock instream structures and other stabilization measures will be specified to ensure channel stability. 

 

Design reviews with the watershed association, Susquehanna County Conservation District, Choconut Township, and adjacent landowners will be conducted throughout the design process. 

 

A detailed Erosion and Sedimentation Prevention plan will be developed as a component of the design phase.  The Susquehanna County Conservation District will be very involved in erosion and sedimentation prevention practices to be designed for the project. 

 

A maintenance plan will be developed for the restoration reaches.  This plan will target potential partners and beneficiaries of the restoration effort. 

 

 

Fall 2003 – Summer 2004

Permit applications and all required supporting documentation will be prepared and submitted to the proper agencies. 

 

An amendment to a watershed-wide permit applied for in 2002 will be submitted to PADEP and USACOE  for technical review. 

 

 

Operation, Maintenance and Replacement Tasks and Responsibilities

 

  1. Develop Operation and Maintenance (O&M) Criteria (LDG)

Guidelines for operation and maintenance of the restored areas of stream channel will be developed for use in the O&M agreement.  Specific criteria  will be provided to guide when maintenance is required and how is should be completed. 

  1. Draft landowner O&M agreement (LDG, SCCD, CCWA)

A detailed landowner agreement will be developed for use with constructed restoration projects.  This agreement will outline allowable streamside maintenance practices adjacent to the restoration area.  The agreement will prohibit activities that have the potential to reduce the effectiveness of the restoration work. 

  1. Recruit O&M partners, secure commitments.  (CCWA)

The local townships and the county are likely partners for the O&M agreement.  Additional partners and funding sources will be sought through this process. 

 

 

Project Deliverables (Responsible Party in Parenthesis)

 

  1. Educational meeting as a project kickoff to present the project scope and information about the assessment and restoration process to the public. (LDG & CCWA)
  2. Comprehensive natural channel design, planting plan, stabilization measures, and specifications 1.5 miles total stream channel length. (LDG)
  3. Complete existing condition plans and proposed condition plans ready to complete construction. (LDG) 
  4. Joint Permit Application (LDG)
  5. Operation and Maintenance Plan (CCWA & LDG)

6.     Riparian Revegetation Plan (LDG)

  1. Post design public meeting (LDG, CCWA)

 

 

 

Measurable Environmental Results/Benefits

 

 

  1. Non-point source sediment loads from the Choconut Creek Watershed will be significantly reduced upon construction of this design.
  2. Natural channel design and permitting will be completed for 1.5 miles of stream channel.  Implementation of this design will reduce bank erosion and sediment output from the 1.5 mile reach. 
  3. The quality of a downstream 3,600-foot restoration project currently in progress will be improved by reduced sediment loads from this project. 
  4. Stream habitat for macroinvertebrates and fish will be improved not only in the restoration reaches, but in reaches downstream from the project. 
  5. Embeddedness will be reduced as a result of increased channel stability and decreased sediment discharge from the headwaters. 
  6. Downstream reaches of Choconut Creek that flood frequently due to reduced channel capacity and increased sediment loads will benefit from sediment reduction.  Downstream channel migration will be reduced as sediment loads decline.
  7. Threats to infrastructure and personal property in the Choconut Creek Watershed will be reduced.       

 

Disposition of Equipment

 

All equipment purchased with funds from this grant will be converted to the Choconut Creek Watershed Association for use in the further restoration and preservation work.